easywire - Save Time, Save Money
"LABOUR SAVINGS OF AROUND 90% ARE ACHIEVED COMPARED TO TRADITIONAL WIRING METHODS"
A PROVEN METHOD THAT DRAMATICALLY REDUCES THE WIRING/INSTALLATION TIME OF MULTIFUNCTION POWER METERS AND CURRENT TRANSFORMERS.
These savings are made possible due to the innovative design of both the current transformers and the meters, which allow plug in connectors to be used for both current and voltage input/output. An RJ45 lead is used for connecting between the three phase current transformer and meter, and ‘ready‑made’ plug-in leads are used for the voltage input.
The meters are provided with both input and output voltage connections which allow up to 32 meters to be daisy chained to a common supply voltage via the first meter.
Please Sign in to view our prices and to order online or Create an account